Replace existing shower with Thermo shower, new tiles and vinyl flooring. in Stubbington
Needed: Bathroom Specialist in Stubbington, PO14
Job submitted:Jan 5, 2009
Job description:Replace a couple of 18mm water resistant floor panels. Install approx 4sqm vinyl floor. Install approx 7sqm large tiles, after removing existing waterboard. Remove existing shower unit and supply and fit thermostatic mixer shower. Install existing new bathroom cabinet and make good shoddy decoration. The entire bathroom is approx 2M X 2M in an 80's house.
Budget:£500 - £1,000