Raise the level of front boundary wall in Dene
Needed: Bricklayer in Dene, NE7
Job submitted:Mar 29, 2008
Job description:Rebuild part of a front boundary wall approx. 14 metres long and raise the level by approx. 0.9m (currently 0.2m at one end and around 0.5 at the other as the footpath slopes down) . Finished height 1.1m to 1.4m to allow for the slope. The current wall dates from the 1920's and is 2 courses of engineering type red bricks. There are more modern solid pillars at either end at approx 1.2m and 1.6m high. The higher end of the wall seems to be fairly solid but the lower section has crumbling mortar and will need to be rebuilt.
Budget:I'm not sure