Internal reconfiguration of cloakroom in Wallisdown and Winton West
Needed: Builder in Wallisdown and Winton West, BH11
Job submitted:Mar 6, 2007
Job description:reducing size of downstairs plasterboard construction cloakroom presently 5'10" x 4'2" to 5'10" x 2'2" and replumbing existing toilet and wash basin to fit in reduced space. Washing machine presently in cloakroom, to be resited in kitchen. Cloakroom is built into kitchen.Also resite ceiling light socket in cloakroom.
Budget:N/A