Refurbishment works - opening up various areas in Whitby
Needed: Builder in Whitby, CH65
Job submitted:Mar 6, 2007
Job description:a) Incorporate more toilet cubicles ? perhaps taking over area between public toilets at the rear and our own female toilets (WH08), allowing for more space b) Replace window opening with double door access to rear of building either in rooms WH32 or WH12 c) Incorporate ramp between new double doors and studio fire escape entrance as well as extending current ramp from studio to bowling green pathway d) Remove walls either side of chimney breast between rooms WH12/WH32 and WH23/WH37 e) Remove stud walls between WH11 and WH12 as well as WH37 & WH38 f) Remove the 4 steps on 1st floor hallway and incorporate a ramp ? ceiling should be able to be lowered to accommodate gradient Plans of Whitby Hall and the works required are available if required
Budget:N/A