Removal of load bearing wall and lifting of floor and plastic sheeting roof on leen-to. in Peel Common
Needed: Builder in Peel Common, PO13
Job submitted:Aug 25, 2010
Job description:remove two walls both about 2.5 to 3 meters long. i think both are load bearing. extend kitchen room though old outside wall into new conservetry type room and lift floor and roof to match currect level of kitchen. currently about a foot lower.
Budget:£1,000 - £2,000