Replacing existing domestic Consumer Unit in Goat Hall
Needed: Electrician in Goat Hall, CM2
Job submitted:Sep 12, 2008
Job description:Existing fuse wire based CU in large hall cupboard on outside wall needs replacing with new split load CU already on site, an additional connection is required due to a new garage being built, armoured cable in place outside and will need bringing inside A consumer unit within the garage will need fitting and connecting too, this is already on site. Actual Timing is dependent on the garage being completed - advertised elsewhere on this site - thanks for looking - regards Richard
Budget:I'm not sure