Utility Room - Boiler moved, needs various. in Farnham Common
Needed: Kitchen Specialist in Farnham Common, SL2
Job submitted:Dec 29, 2008
Job description:In our Utility room, the boiler has been moved from the floor to the wall. That's left a 40cm gap at the worktop level, and a 60cm gap beneath. There is also some tiling that needs doing, and it all needs to be finished off nicely. To make it look good again, we need 1/ A new worktop - 2.41m, 2/ A double cupboard under, (with doors as much like other doors in room as poss.) The worktop needs to be matched to an existing worktop which joins at a right angle. 3/A new sink plus drainer, 4/ New taps. The area where the works have taken place will require the usual for this sort of job - bits of tiling, runs of sealant and so on.
Budget:I'm not sure