Got new bathroom fitted. Walls need plastering before tiling. in Sunnyside
Needed: Plasterer / Renderer in Sunnyside, S66
Job submitted:Jun 20, 2011
Job description:all plaster has already been chipped off so is ready to go. Around the bath is due to be tiled but first needs plastered. Along the bottom of the bath there are some larger holes as the wall needed to be chipped out to fit the bath. wall that has the window on also needs either plastered or plaster boarded and skimmed. this wall also has the new sink and toilet on. the sink and toilet were originally boxed in and we have taken this away which has caused some damage to the wall. It is not a big bathroom.
Budget:Under £250