Small leak in dormer window roof in Halewood West
Needed: Roofer in Halewood West, L25
Job submitted:Jan 5, 2011
Job description:To strip all of front dorma roof of all felt and tiles behind the same dorma. To re-felt same area in a 3 layer system, cross ply with new green mineral felt flashing and drips. To replace all tiles to rear of dorma. To finish in green mineral felt or paint in silver solar heat reflectant paint.
Budget:£250 - £500