Previous building jobs in Princes Risborough, Buckinghamshire
The Risboroughs, HP27
Under £15,000
Small outbuilding to bungalow to be rebuilt and incorporated into the main structure. Internal walls to be taken down. Two doorways to be filled in and a door resited. Ceilings to be reinstated and repaired. Window to be removed and replaced with french doors. The bungalow is in Princes Risborough in Bucks
Timing: Within 2 months
The Risboroughs, HP27
Under £1,000
fixing a damp problem in our front bedroom, could be gutters, roof or condensation from our ensuite shower
Monks Risborough, HP27
Under £15,000
4 bed bungalow -Removal of old fittings,some replastering,Reinstate roof timbers,seal off loft extension.Update electrics and plumbing as necessary - full redecoration to leave in lettable condition
Loosley Row, HP27
Over £30,000
I require a contractor to knock down an existing extension erected 8 years ago and install an Orangery, however this will require piling since the original structure did not have sufficient foundations and has moved. This is an insurance job and has been approved fpor replacement with in approved budget levels. Planning consent and building regs approval has been obtained.
Loosley Row, HP27
Under £500
removal of wall between lounge and kitchen need price and job done asap
The Risboroughs, HP27
Under £15,000
I have a georgian conservatory needing renovation. Rather than replace I would like to turn it into a small single storey extension
Longwick, HP27
Under £15,000
need a room made in the kiving room and decorating in 3 rooms upstairs
Speen, HP27
Under £4,000
I am looking for a quote to have a retractable roof canopy supplied and / or fitted. It is for a local village hall. The building is an L shape and the canopy is needed to create an outdoor space to keep children and parents dry.
Owlswick, HP27
Under £500
We have a Dovre 2000 style wood burning fire located directly below the chimney. The chimney was previously serving an Aga so is currently lined with a 6 inch liner (I think) - the chimney looks large enough to serve the fire but need connecting up (existing liner removed). The connection on the fire is about 1.5 metres below the entrance to the chimney and is almost perfectly aligned. Should not be a difficult job.