demolish brick out house with concrete roof. approx. size 2400 x 2400 x 2400 high to demolish and remove
Broughton, M7
Under £100
I am currently selling my house a viewer came to see my house with a builder and the builder said that above my bay window it appears to be bowing due to this I would like an independent quote to see if this is the case or wether its a case of difference of opinion.
Broughton, M7
Under £8,000
written quotes required for complete re roof [slate] up and over and out rigger and pointing 3 walls to rear of building.
Broughton, M7
Under £30,000
Updated : We would not be able to start works before beginning of October due to work commitments. Sorry, didn't change from asap when submitting. Original : To build single storey extension and conservatory on Victorian Terrace. Plans submitted for Building Regulations
Also to quote for removing plaster and replastering 2 downstairs rooms.
Quote for Damp proofing following / during above works.
Quote for central heating to whole house including extension with new boiler (12 Radiators over 3 floors)
Broughton, M7
Under £15,000
Updated : Will require full plumbing of the ensuite. Original : Fit en suite in Attic Room will require stud walls builidng, lower ceiling, Fit spot lights and fit additional electrical sockets. Remove fireplace and fir air vent in attic.
Lower ceiling in kitchen approx 20cm, fit spot lights and move 1 plug socket.
Fit internal stud wall to cellar approx 3msq.
Broughton, M7
Under £100
Replace or repair 3 wooden staircase pole which are broken or missing.
Broughton, M7
Under £30,000
Renovation and Refurbishment of house
Broughton, M7
Under £15,000
kitchen renovation take a wall down put in RSJ
Broughton, M7
Under £8,000
I have bought a terrace house in salford and the building survey i commissioned shows several areas of repair needed to house and backyard walls and steps. I need it repaired and brought up to lettable standard with damp issues addressed and repairs as per the building survey, decoration as necessary and certificates for gas and electrical safety, environmental audit at the finish and all the gasa and electrical work needed to bring the house up to a safe and good lettable standard for students.