How to build an English bond
You're ready to build a wall, here's one technique you can use ...
Level of difficulty
Level 2: Intermediate
What you need
- String line
- Bricks
- Bricklaying trowel
- Hammer
- Mortar
- Spirit level
The steps to follow
- First lay a foundation strip before building the wall.
- Fasten string lines on pegs and stretch the string line across the foundation strip.
- Dry-lay the brick to give you an idea of what the brick wall will look like.
- Start by laying the first corner brick. Either lay the shorter end of the brick (header) or length of the brick (stretcher) facing you.
- Next, place the queen closer (a brick cut lengthwise) right next to the corner brick.
- Leave a 1cm (3/8in) gap between the two bricks.
- Finish dry-laying the first course of bricks.
- When you're sure of this first course, relay the bricks.
- This time, fill in the gaps between the bricks with 1cm (3/8 in) mortar joints.
- Check if the course is level with a spirit level.
- For the second course of brickwork, lay the brickwork at the header end if your first course was a stretcher course, and vice versa.
- To complete the wall, alternate the headers and stretcher courses.
Share this page