
Jason Rozario
In a normal case , you should move it to as far away from the property as possible so to your boundary line ,but it makes sense to notify your building inspector of the issue before hand as he may want you to connect into a rain water drain near by of he may be ok with a shorter distance for a 1 cubic meter soak away. Jason Edifice projects