I’m looking at SPC click plank flooring and want to install a mass loaded vinyl barrier before it goes down.
The mass loaded vinyl will go over the existing sublfoor planks which have 3mm headboard over them.
Can i fit the SPC plank on the MLV or will i need a layer of 5mm plywood betweeen?