I need an existing fitted kitchen removed, and a new one installed, but there is also some carpentry work required to create a tall cabinet where the old water tank was (there's a gap in the ceiling), as well as possibly some plastering work or at least new lining paper for the walls.
Should I rip out the kitchen and get someone to deal with the walls before fitting the new kitchen?
I want to get quotes for it, but I'm not sure what the best order. or how many tradespeople I'll need.
Would 'kitchen refurbishment' cover all of the above?