Ceramic floor tiles are being laid in my small bathroom atm. The guy was here for six and a half hours today and as far as i can see all he has done is drill some screws into the existing hardwood floor and draw the outlines of some of the tiles. I really don't know if he is just being extremely methodical or if he is taking the mick. A little help would be appreciated. Thanks.