Darren Butler
Hi Clare. It sounds like you have movement in the floor boards beneath the tiling, it would be the responsibility of the contractor to have made sure that the sub-floor was secure. It could also be that a poor tile adhesive has been used, or that the floor wasn't clean enough prior to laying the tiles. Either way, I'd think it was the fault of the installer.