depends on scale of work
depends on scale of work
Hi Jacqueline if you are having a small area re-felted and tiles replaced then it's only a small job but if you are having the whole roof re-felted then the roof will need to be stripped of tiles and lath. The amount of time taken to replace the whole roof will depend on size and type of roof ( hipped roof will take longer than gable end roof) and type of tile, the fascia can be replaced at the same time. Ed
Nick shares his story of finding local tradespeople in his new area.