To remove the old cement and re-bed the tiles etc etc on the side of a terraced house? It is not in the c.os.t guides and - Some of them I have had have been so varied from 1500 and right down etc
(One side meaning the gable end - up one side and down the other side
What should this job entail etc
Thanks