Andrew Procter
It should be hard wired into a double pole switch. You could also wire in a timer to the circuit. It should have its own circuit, not wired into a socket circuit, because of the large load. regards Andrew
It should be hard wired into a double pole switch. You could also wire in a timer to the circuit. It should have its own circuit, not wired into a socket circuit, because of the large load. regards Andrew
Hi Todd It melted because was overloaded possibly someone connect to socket circut. I would suggest to get electrician back to sort it out Regards Rafal