Just for record if it's the top coat leveller you are talking about then 24hours as only max 3mm thickness
Just for record if it's the top coat leveller you are talking about then 24hours as only max 3mm thickness
Hi Tony It takes 1 mth per inch and if you do it before then the flooring will blow and to install vinyl first it needs a top coat leveller as vinyl mimics the surface it sits on this will also blow making it very expensive prob. Check with builder as the base would of being 1 of the first parts of the job. Andy