We are currently having an extension done. When complete, i would like to lay a Vusta vinyl floor. How long after the screed goes down is an appropriate time to leave before laying a floor?
Andrew Kimberlee

Andrew Kimberlee

Hi Tony It takes 1 mth per inch and if you do it before then the flooring will blow and to install vinyl first it needs a top coat leveller as vinyl mimics the surface it sits on this will also blow making it very expensive prob. Check with builder as the base would of being 1 of the first parts of the job. Andy