Try a DPM Damp proof membrane It comes in a 2 part mixture that has to be mixed very well, Then using a roller apply to the floor. All the best R.T Flooring
Try a DPM Damp proof membrane It comes in a 2 part mixture that has to be mixed very well, Then using a roller apply to the floor. All the best R.T Flooring
Hi If you've had a new concrete floor laid then you need to leave it to dry out before you cover it with anything. This takes approx one day per millimetre of depth of concrete. E.g. 50mm thick concrete will need 50 days to dry out. Then you must do a damp test on it to ensure it is dry enough for your chosen floorcovering. Hope this helps.
Hi Lucky Sounds very much like you haven't got a damp proof membrane which is essential when laying wood or laminate flooring over concrete