George Fecsik
Hi this is a good question. 3-5000 £ labour cost and 2500 £ basic material but mainly depend 1.you keep the layout or not. 2.Tiles all around to ceiling or half way up. and 3.shower tray can be a fortune as well (size) 3.underfloor heating yes or no.. 4.Size of existing bathroom. I hope this is helpful Regards G Fecsik Man That Will