
Richard Johnson
The floorlayer should have tested for moisture before laying the screed. If any was present then an epoxy damp proof membrane could've been applied to the tiles and then screeded after a coat of primer was also applied. Different surfaces require different sorts of screed and with all due respect, a carpet shop wouldn't probably know this. Next time get a professional floorlayer in to do the works.